2010
January 10, 2010
Solving for the iron triangle with kanban and scrumban
Scope, quality, schedule — pick two. Hint: Quality is fixed.
January 3, 2010
A time to work, a time to slack
Why 100% utilization is an awful idea.
Scope, quality, schedule — pick two. Hint: Quality is fixed.
Why 100% utilization is an awful idea.